8월2720205. 기타(산업설비 외) 2020.06 ~ 진행중/ 삼성물산Post navigationPreviousPrevious post:Ultra Clean Fuel (UCF) Diesel Euro V Project 배관설계 / 현대엔지니어링NextNext post:MIE Project-II (Oil & Fire Water) Pump Station 3D Modeling / 삼성물산Related PostsMERCK RGA Level-up Project (Feed) 3D 배관설계26/04/2024SK ecoengineering Project 배관설계25/04/2024린데코리아 HG Laser mix 상세설계25/04/2024포천파워 Gas Turbine Air Cooling System Water Pining 3D Modeling 설계25/04/2024램리서치 KTC Tool 3D Modeling(4개 BAY)25/04/2024송도 셀트리온현장 Shop 설계용역25/04/2024